Asphalt mixing plant equipment disassembly process

03 Nov 2019 09:00
Tags

Back to list of posts

elevate-system-1-300x197.jpg

We have mainly introduced some aspects of the station construction before, and there may not be any mention about the disassembly.

In fact, when our work is over, we need to complete the disassembly of the asphalt mixing plant within a certain period of time.

So, what issues should we pay attention to when doing the disassembly work? Let's take a look at the specific content.

First of all, we need to do the appropriate preparations.

This is because the equipment is more complicated and the size is large. Before the disassembly, the seat needs to be made into a feasible disassembly plan according to the location and the actual situation on site.

Secondly, we also need to conduct comprehensive systematic training and technical exchanges for all those involved in the demolition work.

Finally, we should also design a mutual position map based on the layout of the asphalt mixing plant for reference during installation.

When actually disassembling, it should be noted that it must be implemented in accordance with the requirements of the program.

For example, it should be noted that the wires and cables must not be cut, and three comparisons are required before the cables are removed, which are the internal wire number, the terminal board number, and the external wire number.

After these confirmations, the asphalt mixing plant can be dismantled as required.

Otherwise, appropriate adjustments are needed to avoid losses.

In the process of disassembly, in order to ensure that we can continue normally, we need to mark and identify.

Also, be sure to use special tools for destructive disassembly.

All removed bolts, nuts, and locating pins should be screwed back or inserted back into place immediately after oiling to avoid confusion and loss, affecting the normal use of the asphalt mixing plant.

As a staff member, all the removed parts need to be inspected and cleaned. It is best to do rust prevention work.

After the disassembly work is completed, it should be stored reasonably according to the requirements, and the asphalt mixing station should be cleaned on site.